Days 139 through 141

It was a long weekend for us trying to get a few things done at the house.  First a little bit from things that were done on Friday. Now that the shower tile was finally dry, they could install the fixtures in the master shower.  Richard saw it before I…

Share

Day 96-Septic and Drywall

Thursday was day 3 of Drywall and lots of progress was made, mostly downstairs. Homeschool Room: Sunroom: Master Bathroom: Kitchen: Craftroom: Powder Room: Laundry: They were still working on our master bedroom when we left and the garage hadn’t been done yet either.  We assumed they would have some work…

Share

Day 80-Well Drilling

Bright and early this morning we got a call from the crew headed out to the land to drill the well.  This sign has been sitting by our driveway for several weeks, but the day had finally come and they wanted to check on a few things before they went…

Share

Day 54-Meetings and Rough Ins

Today we had two important meetings about the house.  The first was a walk through with our Field Manager now that framing is done.  Our FM is coming off some time off he had scheduled and is still coming up to speed with everything (I believe they can have a…