Site Loader

Days 139 through 141

It was a long weekend for us trying to get a few things done at the house.  First a little bit from things that were done on Friday. Now that the shower tile was finally dry, they could install the fixtures in the master shower.  Richard saw it before I…

Share

Day 124-Final Electric

Yesterday I spent the entire day at the house while the electricians started the final electrical.  One of the first thing I told them was that if they got the electric finished up with the HVAC they could turn on the air conditioning since it was installed the day before. …

Share