Site Loader

Drainage

So our excavator sent us photos today of the downspout and sump pump underground discharge piping he put in last Friday.  He had to connect the 8 downspouts and the 2 sump pump lines together and then ran them out to a low spot in the side of the front…

Share

Day 97-Septic Finalized

Friday was the 2nd and last day of the septic install.  Our contractor is thorough but efficient and he not only finished our septic, but he also regraded our whole landscaping, put in our permanent water egress from the downspouts and sump pumps and started working on a swale for…

Share