Site Loader

Days 144-146

Wednesday (day 144) was to be final inspection day.  Our Field Manager told us he would submit for certificate of occupancy and it would take about a week.  We now understand that the week he was talking about was whatever time would be needed to remedy anything the inspectors complained…

Share

Day 143-Trim and Carpet

So we went out to the house tonight to continue pumping water out of the well to get the chlorine out.  We pumped for an hour or slightly more and the chlorine smell was pretty strong when we started, so we’ll be pumping out a bunch more on Thursday.  We…

Share

Days 139 through 141

It was a long weekend for us trying to get a few things done at the house.  First a little bit from things that were done on Friday. Now that the shower tile was finally dry, they could install the fixtures in the master shower.  Richard saw it before I…

Share

Days 137 and 138

Wednesday (Day 137) was not a very busy day at the house.  Creative Kid and I were there all day because we were supposed to meet Century Link to get our DSL set up for when we move in the house, they never showed up but that’s a complaint for…

Share

Days 135 and 136

Yesterday was day 135 and was the second and last day for hard flooring.  For us that is all of our luxury vinyl plank/tile which is most of our downstairs and the bathroom upstairs and the tile in our master bathroom. I didn’t get a lot of pictures, but did…

Share

Day 133-Hard Floors

Much of today we spent in Lancaster at the Hardwick family reunion (my dad’s side of the family). It rained horribly and was so mild that many of us were cold which I don’t think has ever happened before at our reunion, but I suppose we were due as we’ve…

Share

Day 132-Pre-Walk

Today we did a pre-walk with our Field Manger in preparation for finalization of our house.  That’s right, we’re steaming towards the finish line!  Before I talk about that though let me tell you about the last couple of days.  On Wednesday I believe I mentioned that the doors were…

Share

Day 130

Today I was at the build to meet a concrete floor coating company to get an estimate on doing a finish on our floor.  We don’t plan to do it right away as it is a pricey expense, but it is something we want to do to protect the new…

Share

Day 129

Today was the day the countertops were going in as well as the last day for final electric.  I prayed that either the electrician or the countertop installers would see my note about the Ethernet cable in the cabinet.  Today was also our Field Manager’s first day back to work…

Share

Day 126-Ethernet

We spent our day today out at the house build doing the finishing part of the Ethernet cables we had run throughout the house.  We were originally planning to run it, but the electricians told us they would run it for $20 a cable which included boxes, staples and protection…

Share